Results (
English) 3:
[Copy]Copied!
In particular, if the damage causes a reduction in the production of the photovoltaic park, the beneficiary shall be obliged to repair it within 48 hours, provided that the required spare parts are within the minimum reserve of spare parts<br>
Being translated, please wait..
